发现好书期刊,享受阅读乐趣

海量图书期刊资源,随时随地畅享阅读乐趣

Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times

Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times

T.C.E. Cheng; B.M.T. Lin; Y. Tian
  • 作者T.C.E. Cheng; B.M.T. Lin; Y. Tian
  • 卷第36卷
  • 期第11期
  • 印刷ISSN0305-0548
  • 文件大小730.68KB
  • 发表时间2009
  • DOI10.1016/j.cor.2009.02.001
  • 页码3031-3040
← 返回【学霸图书馆】主页