[IEEE 2013 Winter Simulation Conference - (WSC 2013) - Washington, DC, USA (2013.12.8-2013.12.11)] 2013 Winter Simulations Conference (WSC) - Scheduling maintenance tasks with time-dependent synchronization constraints by a CP modeling approach
Lange, Jan; Weigert, Gerald; Klemmt, Andreas; Doherr, Peter
- 作者Lange, Jan; Weigert, Gerald; Klemmt, Andreas; Doherr, Peter
- 文件大小788.80KB
- 发表时间2013
- DOI10.1109/wsc.2013.6721725
- 页码3642-3653