[IEEE 2013 6th International Conference on Information Management, Innovation Management and Industrial Engineering (ICIII) - Xi'an, China (2013.11.23-2013.11.24)] 2013 6th International Conference on Information Management, Innovation Management and Industrial Engineering - An improved measurement method of operational risk based on Monte Carlo simulation
Mao, Yuxing; Zhang, Chenghong; Ling, Hong
- 作者Mao, Yuxing; Zhang, Chenghong; Ling, Hong
- 文件大小115.20KB
- 发表时间2013
- DOI10.1109/iciii.2013.6702942
- 页码332-335